+7 (499) 180-81-01, +7 (915) 379-79-62, +7(903) 766-85-40   info@rostorkret.ru

TUNNEL WALL CONSTRUCTION 3

Levelling and pressure walls were constructed along a diaphragm wall for MRHW using wet 150 - 250mm thick В30 W10 F300 shotcrete.