Levelling wall area stood at 2,500 m2 and pressure wall area stood at 2,000 m2. Levelling and pressure walls and pump house walls were constructed along bored piles using В30 W8 F300 shotcrete to a thickness of 100-500mm. 2,300m3 of concrete were placed over 3 months.