Work was performed to restore the concrete floor slab after the fire. Hydrodynamic cleaning of the concrete surface was performed using a 250 bar high-pressure apparatus, shotcrete was applied using a dry method with an average thickness of 50 mm and treated using plastering technology to a very poor surface of A3. the Work was completed in 2 working days, with an area of 45 sq.m.